Addonics Technologies SCHD SA-FW Manual de usuario Pagina 172

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 408
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 171
Installing a new S8300 using the Avaya Installation Wizard
172 Installing and Upgrading the Avaya S8300 Server
Administering an S8400, S8500, or S8700-series
primary controller when the S8300 is an LSP
In this case, the S8300 you have installed is configured as an LSP.
!
CAUTION:
CAUTION: This administration applies only to the primary controller that controls the S8300
LSP that you are installing. The primary controller can be an S8400, S8500, or
S8700-series Server. Do not administer the S8300 LSP. Translations are
automatically copied to the LSP from the primary controller.
Skip this section and go to Administering an S8300 primary controller
on page 165 if the
primary controller is an S8300.
Note:
Note: Some of the procedures in this section may have been completed previously as
part of a normal server installation.
For the majority of required administration, see Administering Avaya AuraCommunication
Manager, 03-300509, or Administering Network Connectivity on Avaya AuraCommunication
Manager, 555-233-504.
In this section, you will use the SAT interface on the primary controller to:
Assigning Node Names and IP Addresses for the C-LANs and LSPs
Administering Network Regions
Administering IP Interfaces
Identifying the Survivable Processor on the primary controller
Assigning LSPs with Network Regions
Note:
Note: For information on installing the C-LAN boards on the S8400, S8500, or
S8700-series port networks and complete information on installing an S8400,
S8500, or S8700-series Server, see the Installation documentation on the
Documentation for Avaya AuraCommunication Manager, Media Gateways and
Servers CD, 03-300151.
Vista de pagina 171
1 2 ... 167 168 169 170 171 172 173 174 175 176 177 ... 407 408

Comentarios a estos manuales

Sin comentarios